I have dug my basement deeper and will have a toilet connecting to a 4 pvc sewer line under the slab that runs 45 to an ejector pit. I know the current rough-in does not meet code but, assuming it passes inspection, I am wondering if it is good enough as my contractor claims. On average the slope of the line is almost precisely ¼ per foot, but the slope varies. The first 10 is 0.17 per foot, the next 6 that is between two 45 degree turns is 0.41 per foot, the next 24 is 0.27 per foot, and the last 5 into the pit that begins with a 25 degree turn is 0.11 per foot.
A drawing is attached.
I dont think there is any good reason for the varying slope. I think its just sloppiness and laziness.
Should I insist that it be redone?
Thanks.
A drawing is attached.
I dont think there is any good reason for the varying slope. I think its just sloppiness and laziness.
Should I insist that it be redone?
Thanks.